Local Law 11 Facade Projects in NYC, Planned Before You Sign

A facade report tells you what is wrong with the building. It does not tell you what the repairs should cost, which bid to trust or how to fit the work into the time you have. We help boards, managing agents and owners answer those questions, then carry out the Local Law 11 repairs with our own crew.

See what moves a facade budget up or down before any bid arrives.

Line up every bid item by item so the price gap makes sense.

Order the work so the deadline and the budget both hold.

Free Estimates After a Site Visit

Every estimate is written once we have seen the building.

Our Own Crew and DOB Permits

We file the permits and do the repairs ourselves.

Licensed Partner Inspectors

Inspections stay with licensed QEWIs; repairs stay with us.

Additional Insured on Request

Your board, agent or owner named on our certificate.

What Does Local Law 11 Require in NYC?

Local Law 11, now run by the Department of Buildings as the Facade Inspection and Safety Program (FISP), covers every NYC building taller than six stories. Its exterior walls and appurtenances must be examined every five years by a Qualified Exterior Wall Inspector (QEWI), who files a report rating the facade Safe, Safe With a Repair and Maintenance Program (SWARMP) or Unsafe.

An Unsafe rating means public protection goes up at once, usually a sidewalk shed, and the conditions must be repaired within 90 days unless extensions are filed. SWARMP items get a completion date from the inspector, and if they are still open at the next report they become Unsafe. The inspection is a small part of the project. Most of the cost and time sits in the repairs, and that is where planning makes the biggest difference.

Scaffolding with wooden platforms set up along a building facade during repairs

What Drives a Local Law 11 Facade Budget NYC

Eight things decide most of what a facade project costs. Some are set by the building and the report; others are choices the board or owner makes. Knowing which is which shows where your decisions actually move the number.

Big Cost Impact

Owner Can Influence

Fixed by Conditions

Small Cost Impact

Owner Can Influence

Fixed by Conditions

All eight cost drivers at a glance:

  1. When the work starts (big impact, owner can influence)
  2. Repair or replace choices (big impact, owner can influence)
  3. Height, access and protection (big impact, fixed by conditions)
  4. What the report found (big impact, fixed by conditions)
  5. How the work is grouped (small impact, owner can influence)
  6. Access to terraces and apartments (small impact, owner can influence)
  7. Landmark review (small impact, fixed by conditions)
  8. Matching older materials (small impact, fixed by conditions)

See how each driver shapes an estimate on our facade repair cost page.

How to Compare Local Law 11 Bids Side by Side

Two bids can sit far apart on price and still describe different jobs. Before the board votes, line them up on these six points. The bid columns are blank on purpose: this is a teaching tool, not real bids.

What to Check Bid A Bid B

Scope: Does it list every condition in the report, by elevation and floor, with quantities?

 

 

Access: Rig, scaffold or rope access, and is the sidewalk shed included or priced separately?

 

 

Materials: Are products and methods named, such as galvanized lintels, stainless anchors or matched mortar?

 

 

Schedule: Start date, length of the job, and how weather and the filing deadline are handled?

 

 

Insurance: Coverage limits, and is your board, agent or owner named as additional insured?

 

 

Close-Out Records: Dated photos, permit sign-offs and the documents your inspector needs for the amended filing?

 

 

We review bids from any contractor, whether or not we end up doing the work. See the full checklist on our scope and bid review page.

Reactive Repairs or a Planned Facade Program?

Repair Each Cycle as It Comes

Plan Across Cycles

See how a multi-year plan is built on our long-term facade planning page.

How We Help With Local Law 11 Projects NYC

Each service answers one question boards and owners bring to us. Pick the one you are stuck on.

Mason's gloved hand setting a brick in fresh mortar

Brick, lintels, terra cotta, cast stone, parapets, balconies and fire escapes, repaired by our own crew.

Construction plans on a wooden table with a drill and screws

A free written estimate after a site visit, priced line by line from your report.

Hands with a pen reviewing contract documents on a table

We review bids from any contractor, ours or not, against the same scope.

Workers on scaffolding renovating a building facade

An order of work that keeps the deadline and spreads the spending.

Hands arranging planners and a calendar on a desk

A written multi-year plan for this cycle and the ones after it.

Two people discussing documents at a conference table

Bids, alternates and records a co-op or condo board can vote on.

How a Facade Project Can Be Phased, One Elevation at a Time

On a typical mid-rise, the order of work follows risk first and access second. This example shows one way a project can run; the real order always comes from your report and your deadlines.

Phasing example: a mid-rise building with four elevations numbered in order of work1 is the street facade and its parapet, 2 is the rear facade, shown as a dashed outline behind the building, 3 is the side and courtyard walls, and 4 is the roof level and bulkheads.1234
  • 1. Street Facade and Its Parapet

    Unsafe items over the sidewalk come first, so the shed can come down as soon as possible.

  • 2. Rear Facade

    SWARMP items on the rear wall follow, often using the same rig moved around the building.

  • 3. Side and Courtyard Walls

    Lot-line and courtyard walls are scheduled around neighbor access and resident use.

  • 4. Roof Level and Bulkheads

    Copings, bulkheads and remaining roof-level items finish the job, then close-out photos go to the inspector.

See how to build your own phasing plan on our phased facade repairs page.

Facade Projects for Co-op Boards and Managing Agents

Board projects stall over approvals and funding far more often than over masonry. We prepare scopes, repair and replace alternates and schedules a board can vote on, join board meetings when asked, and keep the contracts, invoices and photos that lenders, accountants and future boards ask for.

Licensed Inspectors Inspect, We Estimate and Repair

A Local Law 11 inspection can only be carried out by a QEWI, a licensed architect or engineer approved by the Department of Buildings. We do not perform inspections. We work alongside licensed partner inspectors, or the QEWI you already use, and our part starts where theirs ends: pricing each condition, repairing it and documenting the work.

Priced to the Report

Every line of our estimate traces back to a condition the inspector listed.

Records for the Filing

Dated photos and permit sign-offs so the inspector can confirm the repairs.

Your Inspector or Ours

Keep the QEWI you have, or we introduce a licensed partner inspector.

Typical NYC Local Law 11 Projects by Building Type

These are the kinds of facade projects we take on most. Each card shows how scope, phasing and outcome fit together; your own plan is built from your report.

Corner of a historic building with ornamental facade work and a projecting cornice

Pre-War Co-op With a Terra Cotta Cornice

Scope: Steel lintel replacement, parapet rebuild, terra cotta and cornice repair

Phases: Street facade and parapet first, then the rear and courtyard walls

Outcome: Unsafe items cleared first so the sidewalk shed comes down early, with SWARMP work closed before the next report

Modern apartment building with rows of balconies at sunset

Condo Tower With Balconies

Scope: Balcony slab edges and railings, window sealant, cast stone panels

Phases: One vertical stack of balconies at a time

Outcome: Most residents keep their balconies through the job, and each stack is signed off as it finishes

Red brick apartment buildings with fire escapes in New York City

Rental Building With Fire Escapes

Scope: Fire escape restoration, brick pointing, lintel repairs at the windows behind the platforms

Phases: Fire escape levels in sequence, then pointing by elevation

Outcome: Facade and fire escape items cleared under one permit set, with records the owner can show HPD and DOB

Areas We Serve Across NYC

We plan and repair facades on buildings in four boroughs. Each one will get its own guide to the buildings and approvals we see there.

Manhattan

Brooklyn

Queens

The Bronx

NYC Local Law 11 Questions From Boards and Owners

Every building in New York City taller than six stories, including co-ops, condos, rentals and commercial buildings. Their exterior walls and appurtenances are examined every five years under the Facade Inspection and Safety Program.

There is no fair flat figure, because cost depends on the building's height and access, the number and rating of the conditions in the report, and whether items are repaired or replaced. We give a free written estimate after a site visit, priced line by line from your report.

No. Inspections are done by a QEWI, a licensed architect or engineer approved by the Department of Buildings. We work with your inspector or a licensed partner inspector, and we handle the estimate, the repairs and the close-out records.

Public protection has to go up right away, and the conditions must be repaired within 90 days unless extension requests are filed with DOB. Once the work is done, the inspector files an amended report.

The inspector sets a completion date for each SWARMP item. If the same conditions are still open at the next report, they cannot be listed as SWARMP again and are classified as Unsafe.

Yes. We review bids whether or not we end up doing the work, checking scope, access, materials, schedule, insurance and close-out records so the board can compare them on the same terms.

Often, yes. Unsafe conditions come first, and SWARMP work can then be grouped by elevation or season, as long as each item is finished by the date that applies to it.

Yes. We prepare a written plan that sets out what to repair this cycle, what to watch, and what to budget for in the cycles after it.

Yes. We can list your board, managing agent or building owner as additional insured on our certificate of insurance.